Add flange joint

Start with a flange joint record. Add the joint data, create a preliminary Report and continue to an Engineering Review or Verification when needed.

Preliminary Report Create one flange joint record before deciding whether to save or continue.
Engineering Review Have Flange Management check the selected data and preliminary result.
Verification / Register Turn a completed checked result into a private Verification or public Register record.